industry sector: Downstream Refining - oil & gas

Texas Tower Cleaning Dramatically Improves Heat Transfer

Arabian VCFEs cleaned despite wide variety of deposits

ACC Fin-Fans Cleaned in Just One Day

Rapid mobilisation saves refinery $100,000s in replacement costs and lost production

World First: Texas Tower/VCFE drilled from below, despite limited access

Caribbean VCFE tubes cleaned from below with only 2 metre head room and top header in place

Hydrocarbon Plant Blocked Effluent Pipeline Cleaned in Four Days

Jetting pressure and water volumes matched to pipeline deposit

Bitumen Storage Tank Cleaned With Combination Jetting Unit

Coke and carbonized coke removed from tank of worlds oldest and largest oil company

External Fin Fan Banks Cleaned Using Minimal Scaffolding

Cooling increased and contract completed ahead of schedule

Fused Tubular Catalyst Reactor Cleaned in 72 Hours

Nickel Catalyst Yields to innovative rotary drill and polish system

ACCU’s (air-cooled condenser units) Cleaned in Environmentally Sensitive Manner

Air cooled fin fan condensers (ACCU's) cleaned using ‘contained’ method

Flare Line Cleaned On-line. European refinery flare gas line cleaned whilst in operation

Flare line efficiency restored following On-Line clean

Heat Exchanger Cleaning Reduced from 3 Days to 3 Hours and Completed In-Situ

In-Situ Clean Reduced Downtime and Reduces Carbon Emissions

Aluminium Fufural Exchangers Cleaned In-Situ

Blockage removal increased from ca 20 to 90 percent

Crude Oil Heat Exchanger U Tube Cleaning Raised Efficiency

Hard coke and oily, wax like sludge removed from hairpin heat exhchangers

Crude Oil Heat Exchangers Cleaned in Five Hours

Energy efficiencies increases three fold thanks to cleaning of hairpin heat exchangers

Worlds First Furnace Decoking and Unblocking

Blocked serpentine furnace coils cleared in one day

Flare Line Cleaned Without Water Jetting

Inert gas power solves fire risk at Turkish oil refinery

Petrol Tanks Decontaminated With Little Waste

Environmental conditions met during hazardous petrochemical clean

Waste Heat Recovery Unit (WHRU) Cleaning Saves £500,000

Deposits and scale extracted with novel engineering approach

Flame Eye Cleaned On-line at 900°C

Safety eye unblocked at sulphur reaction furnace

Texas Tower (VCFE) Cleaning Time Reduced by 75%

Critical path Texas Tower back online in 2.5 days

Solidly Blocked Hairpins on Titanium Heat Exchanger Cleaned

Bespoke water jetting system used to clean Saudi Arabian titanium heat exchanger