Cleaning Case Studies

Tube Tech International believe case studies are an invaluable record of how the company has solved cleaning challenges that others deemed impossible. Though case studies don’t provide solutions to your cleaning challenges, Tube Tech uses these to help assist clients with similar challenges. These case studies, however, provide material for clients seeking a specialist cleaning contractor with extensive experience in the cleaning of specific heat transfer equipment. Tube Tech International have helped the world’s most challenging cleaning problems, to find how please review our case studies below:

EXTERNAL SHELL SIDE HEAT EXCHANGER CLEANING

Save $100,000.00 to $200,000.00 per exchanger per year by removing external shell side fouling

IRIS INSPECTION STANDARD CLEANLINESS

Save on replacement by confirming asset integrity

TWISTED TUBE™ HEAT EXCHANGERS

Save millions in downtime and energy costs by cleaning both sides.
 
If you would like more information regarding any of our case studies please do not hesitate to contact us. We keep minute by minute records while on site including detailed images and reports. Not only do these provide our clients with accurate historical data to take into their next shutdown or turnaround but they also mean we can demonstrate our experience to new clients quickly and effectively. Keeping accurate archives of every contract means that Tube Tech can refer back to these records as they continually look to improve the way heat transfer equipment is cleaned. Both the sales and technical teams are trained to maintain records both before, during and after contracts and hence our case studies are regularly updated thanks to this record keeping.