info@tubetech.com


+44 (0) 1268 786999

Solving difficult, impossible cleaning challenges


Rapid Reaction To Clean ‘U’ Tube Gas Cooler Offshore

Immediate mobilisation saves offshore platform £1000′s

Summary:

The ‘hairpin’ tube Gas Cooler on a North Sea oil platform was blocked by a break down of ferrules (material inserts within the tube ends) in the first pass of the heat exchanger. The contract was time critical as the platform was losing 8000 barrels a day.

Timeline:

Challenge

Solution

Tube Tech comment

“We originally thought the contract would take 48 hours and were pleased that the contract was completed in less than 24 hours. Tube Tech’s ability to mobilise so quickly was a huge bonus to the client.”

Clients can be contacted via Tube Tech for references.

Back to
Oil and Gas (Offshore - Upstream) Case Studies
Send an Enquiry