WHRU/Hot Oil Heater Unblocked and Descaled Without Cutting

Solidly blocked tubes only accessible through header box

Summary

The WHRU/hot oil heater had become restricted with a thick, hard carbonised deposit. For the contractor, Demag Delaval Industrial Turbomachinery, Siemens™ gas turbine business in Aberdeen, there were also wider issues attached to the problem and the company needed a detailed evaluation of the WHRU’s future lifespan. For a new one to be manufactured would require six months and a cost running into hundreds of thousands. Other ramifications would also be a possible loss of production on the rig while a new unit was built.

Challenge

Solution

Client Comment

DDIT’s Customer Support Manager: “We were exceptionally pleased with Tube Tech’s work and the cleaning performed has saved a significant amount of capital. The unit had been removed from its operational site and the easiest way to proceed was for it to be transported to Tube Tech’s premises.”

Tube Tech Comment

Martin Byford, Operations Director: “The WHRU project was another unique project requiring all the technical skills and team work on which our reputation is based. The tubes being so solidly blocked, having so many bends and only accessible through the header box, presented the biggest challenges. The pipework was still descaled and cleaned in just two weeks heralding another first. Our team did an excellent and cost-effective job.”

Clients can be contacted via Tube Tech for references.