Inventive High Pressure Water Jetting

Many innovative alternatives - a new approach to cleaning heat transfer equipment


Vessel Cleaning – 2.5 tonnes of solid styrene removed

Rock hard deposit removed in under 3 days

Summary

An occluder vessel within the UK base of an international petrochemicals giant had become blocked with 2.5 tonnes of solid styrene following a batch error. Tube Tech was contacted after traditional high pressure water jetting contractors had spent 5 days trying, and failing, to remove the blockage.

 

Challenge

 

Solution

 

Tube Tech comment

Peter Lord, Technical Sales: “Our client needed our systems to work as they had wasted time and money with their previous contractor. As always Tube Tech arrived on site prepared for any eventuality and we once again were able to demonstrate our fast, safe and effective vessel cleaning abilities.”

Clients can be contacted via Tube Tech for references.