Offshore Wind Farm Sections Cleaned

Safe working combines with efficiency

Summary

The transition pieces on a sea based wind farm were cleaned prior to the turbine towers being connected. Located 10 miles off the UK coastline the operator required a cleaning contractor with confined space training, the ability to work at height and also be offshore certified.

Challenge

Solution

Tube Tech Comment

Scott Donson, Technical Sales Manager: “This was the first time Tube Tech had been contracted to clean an offshore wind farm. Our experience of working safely in confined spaces, at height and on offshore platforms meant we were well suited to clean the transition pieces within our clients timeframe plus solve all logistical challenges as no services were available. Our operatives were as ever exceptionally professional and ensured the contract was completed safely, efficiently and on time”.

Clients can be contacted via Tube Tech for references.