Fin Fan Cleaning Improves Heat Transfer

Air pressure of tubes tested and repaired

Summary

Tube Tech International used its all-round expertise to satisfactorily solve several problems with the fin fan air blast coolers at the Engineering Steels Division of Corus. Tube Tech took on the total management of the project at the Thrybergh Bar Mill near Rotherham in Yorkshire, covering all aspects of the cleaning, inspection, pressure testing and tube plugging operations.

Challenge

Solution

Client Comment

An Independent heat transfer consultant of Lincoln-based Industrial Energy Surveys said: “As on earlier jobs of this type Tube Tech did a good job. Tube Tech has good methods and are resourceful. Tube Tech are dependable; they always achieve a satisfactory result within the short window of opportunity of a planned shutdown despite unexpected eventualities.”

A Corus, Thrybergh-based, Mechanical Engineer said: “The Tube Tech teams did an excellent job in the short time that was available to them. We asked them to carry out the work on a 24-hour basis as time was short and other work had to be carried out during the downtime. The work by Tube Tech has increased the heat transfer of the coolers which were blocked and there is now a reduced risk of plant failure, with the added benefit of energy savings.”

Tube Tech Comment

Scott Donson. Technical Sales Manager: “This contract was challenging but with detailed planning and the ability to access a variety of cleaning equipment we once again provided an excellent service to our client.”

Clients can be contacted via Tube Tech for references.