Summary

Shell and tube side was expected to be fouled 10%. In reality both sides were fouled 60% on two Israeli VCFE’s. They had not been cleaned since installation 16 years ago. Tube Tech International cleaned the Texas Towers, shell and tube side simultaneously with new multi drill system. VCFE’s cleaned in a very short period of time using innovative cleaning techniques.

Challenge

Solution (Tube Side)

Solution (Shell Side)

Tube Tech comment

Mike Watson, Managing Director: “Planning Planning Planning. From designing the support structure to hold both VCFE’s vertically and safely to sending the client 3D animations of scaffolding requirements there was no ambiguity. The thorough testing of new innovative cleaning solutions in house was also highly beneficial. Tube Tech have never cleaned such fouled Texas Towers yet were able to develop ideal technology. Communication and minute by minute reports ensured the client knew of everything that was going on. A very happy client.”

Clients can be contacted via Tube Tech for references.

Back to
Refineries (Onshore - Downstream) Case Studies
Send an Enquiry