Heat Exchanger Cleaning in Cat Cracker Unit Reduced from Days to Hours.

In-Situ Cleaning Reduced Downtime and Carbon Emissions

Summary

Experience gained by Tube Tech International in a series of heat exchanger cleaning projects for BP enabled the exchanger descaling specialists to clean one of the refinery’s most important straight tube bundles in six days instead of nine. Cleaning its smaller sister bundle was reduced to three hours from the previous three days. At the same time Tube Tech delivered a consistently higher level of cleanliness.

Challenge

Solution

Client Comment

The Refinery Planning Team Leader said: “Tube Tech’s system produces brilliant results. It saves on mechanical work and cranage as well as cutting down on the cost of spare parts such as bolts and gaskets. Previously, the tubes were not completely cleaned through so there were blockages remaining. Therefore, as performance reduced much faster, cleaning was needed less frequently.”

Clients can be contacted via Tube Tech for references.

Back to
Refineries (Onshore - Downstream) Case Studies
Send an Enquiry