Furnace Tube Decoking “ON-LINE!” at Far East Distillate Synthesis Plant – World First!

Blocked serpentine furnace coils cleared in one day

Summary

The request from the client was to develop a procedure in order to remove severe blockages of coke which had formed some distance along the inside of 2 x 100mm diameter 45m long serpentine furnace tubes. Additionally Tube Tech was asked whether it believed it possible to unblock both lines whilst the unit was online and operating at 430 degrees centigrade so as to avoid incurring costly production downtime for the plant.

Challenge

Solution

Tube Tech Comment

Mike Watson,  Technical & Managing Director: “Whilst we were unable to carry out cleaning online at 430 degrees C we were confident our procedures would have been up to the task due to exhaustive and successful trials carried out in the UK . It must be said however that even navigating 45m of bends to unblock rock solid coke formation at 120 degrees C is no easy task and may in itself be a world first. Of course furnace de-coke and cleaning online for the client would have been the icing on the cake. Nevertheless it delighted the client to hear we had broken through both blocked serpentine furnace coils so quickly, which was to substantially improve the furnaces performance.”

Clients can be contacted via Tube Tech for references.