Tube Tech International Ltd (TTIL) was contracted by a leading Nigerian process and pipeline services delivery company working at the forefront of innovation and technology. TTIL was tasked with the cleaning of a Furnace F-4110, which had been underperforming due to fouling, at the company’s facility on Bonny Island at the southern edge of Rivers State in Nigeria’s Niger Delta.

The facility was undergoing a shutdown to service and enhance the efficiency of its processing equipment and took the opportunity to call in heat exchanger specialists Tube Tech, to solve the fouling issues that were causing the facility’s Furnace F-4110 to underperform, costing the company money and causing excess emissions.

The Tube Tech team employed TTIL’s Fired Heater Robotic System, manual cleaning and, due to the specific demands of the job, specially designed cleaning tools.

On arrival, Tube Tech’s Site Operation Manager and the Jetting Technician Supervisor together with the client walked around the working area. Tube Tech advised the client the positions where scaffold was required. Once the necessary scaffold had been installed, Tube Tech’s expert team were able to erect their equipment and commence the cleaning process.

The furnace clean was completed, on time, in three days. Tube Tech’s team was able to return near 100% heat duty to the furnace and, in doing so, provide an instant ROI on the cost of our services.

Images and videos associated with this project are available via Tube Tech International
Click here to request to see them.

Newsletter

Cyber Essentials
FPAL Empowered by Achilles Logo
ISO 9001 Logo
UVDB Verify Empowered by Achilles Logo
Water Jetting Association Logo
RoSPA Member Logo
European Water Jetting Institute
WaterJet Technology Association
ISNetworld Member Contractor