Tall Oil Heater Tube Nest – Oil Deposit Removed

Downtime Reduced by 50%

A biomass power station in the South of England required a rapid response following a mechanical failure on the site. Tenacious deposits needed removing prior to asset integrity inspection.

  • Mechanical failure had caused oil on the shell side to mix with water on the tube side.
  • Fast cleaning was required to identify failure locations and maximise performance.
  • Tube Tech International mobilised within 48 hours.
  • Innovative U-Tube MicroFlex cleaning system was used to unblock tubes.

Technical Sales Manager. “We appreciated the urgent nature of this clients request and responded within 48 hours. A combination of technology helped reduce our client’s downtime by seven 7 days from a previous 14 days using other contractors.

Lead Maintenance Engineer: “The cleaning of the tube nest was so successful we achieved 50% uptime as a result. Pressure testing of the tube nest identified one defective tube.

Related Case Studies

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Praesent sit amet nisl nec elit dictum tincidunt quis vitae nunc. Duis aliquam malesuada erat, quis consectetur justo varius vitae. Praesent faucibus est quis ipsum vestibulum finibus. Maecenas et ex id nibh imperdiet imperdiet. Morbi bibendum vel erat sit amet elementum.

Mud Pump Pipe Cleaning at Tube Tech HQ

Read More

Rock Like Blockage Removed

Read More

Self-Propelled drilling units mobilised to Europe

Read More

Solidified Fat Blockage Removed

Read More

Subsea Pipeline Unblocked On-Line

Read More

Pipeline Cleared of Toxic Nicotine Deposit

Read More

Free Quote - 24 Hour Response

Send us your enquiry below and a Tube Tech International specialist will respond within 24 hours. Regardless of your industry sector or severity of fouling, we will have a solution to deliver guaranteed results.