- Three technologies were applied to cater for narrow access, varying deposit characteristics and the need to drill at 30° from the 14 inch nozzle to the outer tubes.
- A bespoke drilling lance was developed to access outer tubes from the nozzle but still maintain pressure and torque whilst moving the fouling safely without tube damage.
- A low wattage, electronic SafetyBoss was developed to eliminate the risk of cleaning hands and lances exiting the tube unexpectedly.
- Severe coke blockages were removed using a rigid drilling system, whereas softer gum like deposits used a more flexible drilling method.
- In house trials using standard off the shelf cleaning technology was found to be slow due to the gummy nature of the deposit inside a 20m x 12mm tube. The unit was stripped down, rebuilt with more power. At one stage 3 drilling units were operating simultaneously.
- A final pass was used to polish the tubes with the remaining time.